USUV Meetings and Votes
This article is a list of USUV meeting agendas, minutes and vote outcomes for the current term.
xo is the current chair, with mattie as vice-chair.
Votes during this term are displayed in a "Yes/No/Abstained" format.
Meetings and minutes for older terms can be found in the USUV Archives.
Meeting LXXVI, 21 September 2024, STARS HQ
ITEM | ICON | TITLE | TYPE | DESCRIPTION | OUTCOME |
1 | Cabinet Elections | Majority Vote - USUV Members only | 3 elections took place simultaneously: lordpipe left the race at the last second, leaving a single person running for each of the cabinet positions. A vote of confirmation was then held. |
All 3 candidates were voted in by default; 6/0/0, 3/0/3, and 5/0/1 respectively | |
2 | Pearl Renovations | Discussion | A discussion was held on how to slice The Pearl's basement up to give payment to workers clearing out the water.
A 100 diamond payment/slice of the basement was decided, with a proposed 120-150 dia/slice for the larger parts in the middle. A vote was then held to decide the maximum budget provided by the PFC. A 500 diamonds maximum was decided by a 5/1/0 vote. The USUV is calling for possible designs for the basement, with an unknown payment on the table. |
N/A | |
3 | Solidarity Point System | Debate | The chair is asking members how to encouraging meeting attendance.
xo says "members [can] earn points by assisting meetings and voting, and possibly other things in the future - these points can be used for various things like getting USUV embassies built - and i'm thinking of other things, and open to recommendations - but it's mostly setting the idea". The main goal of this is to increase meeting attendance and help town development. xo mentioned "the origin of the idea is that i wanted to find a way to encourage towns building more embassies" Beeper responded "could just dedicate some of usuv fund for embassies for that" Cassey also mentioned free t-shirts every few meetings. |
N/A | |
4 | Market and Trade | Discussion |
|
N/A | |
5 | Member State Promotion and Updates | Discussion |
Reno is closing Dìxià Chéng. Meaning all of Reno's stuff is moved out of DXC and into some other base. Reno mentioned that after AmmiDesu left UV, she lost all interest on continuing the town. Much of Southern Freedom City has been taken over by nature; the meteor is fully visible, the transit hub is soon to be rebuilt in a ruined state, and a few other buildings nearby are showing signs of nature taking over. FC is still a free build zone. Vault 11 is in stasis. |
N/A | |
6 | Events | Discussion |
Niklas' Mario Party is coming along. Niklas wants people to start making minigames for it: Beeper wants to make an Olympics Spinoff where the events are chosen at random, and a secondary effect for that event (maybe a status effect). The name "OlympMIX" was mentioned. |
N/A | |
7 | Any Other Business | Discussion |
|
N/A |
Meeting LXXVII, 12 October 2024, Burzum
ITEM | ICON | TITLE | TYPE | DESCRIPTION | OUTCOME |
1 | Permanent Agenda Item Additions | Majority Vote | Reno says setting the agenda items as permanent is a bad idea. Putting more stress on the chair is not a good idea as they already have alot to do, and the less rules there are the better, as people will feel like they can be more involved with the alliance Beeper (the one who pushed this) and xo say that it would make the job of chair easier as it separates out the chaos of "any other business" Lordpipe agrees with Reno, with there being a template agenda that is extended and removed from as needed for meetings A vote was then held, and the bill was thrown out |
2/4/1; Failed | |
2 | Pearl Basement Renovations and Designs | Statement |
The basement is fully drained thanks to Wind The chair is asking for possible basement designs Reno suggests a design competition instead, make the design process and event with a prize at the end The progress on the spawn tunnel and digging underground into the basement was going smooth around 30 mins before the meeting |
N/A | |
3 | Market and Trade | Debate |
"dead economy" - xo Mercy's skeleton grinder has free bones |
N/A | |
4 | Member State Promotion and Updates | Debate |
DXC is part of STARS now |
N/A | |
6 | Events | Debate |
The labyrinth in Roth is open again, SecondLord has redone the maize and its very hard. Same rules as last year Fishing tourney prep is almost done, scheduling is the last thing needing done Halloween decor at spawn now UV Mario Party was delayed due to Niklas' side project An auction might be held later in November or December, it depends on Mattie's finals scheduling |
N/A | |
7 | Any Other Business | Debate |
Seacrestica Transports got new announcement sounds The USUV wiki pages have been getting updated by blurple Cow is asking how to change now electing new cabinet members works |
N/A |
Meeting LXXVIII, 2 November 2024, USUV HQ
ITEM | ICON | TITLE | TYPE | DESCRIPTION | OUTCOME |
1 | Permanent Agenda Item Additions | Majority Vote |
The Agenda Item bill was proposed again, in a more flexible and clarified state.
The vote was then passed in a 5/0/1, and was retroactively applied to this meeting. |
5/0/1; Passed | |
2 | Pearl Basement Renovations and Designs | Majority Vote |
The basement was cleared out a while ago, and now a design needs to be proposed. Beeper's basement design was chosen in a landslide 6/0/0 vote. |
6/0/0; Passed | |
3 | Highways and Community Projects | Debate |
Beeper discussed the major roadway changes in and around the Western Metropolitan Area, with connections in and between New Spawn, Borealis, and Freedom City being highest priority. Wind talked about the plans for Canvas Lite, a massive mapart creator with automatic material reclamation. Byz talked about the Outpost Roadways, mentioning UVDOT has expanded the system down south to Malus. The end goal is to connect up Eden and Aquileia within the month, but Byz's day job keeps getting in the way. Byz also mentioned the Borealis railway station, which he hopes can be done within the month as well; NoBo station being done by the end of 2024. Niklas mentioned Seacrestica Transports is on the process of planning the expansion to Evergreen. |
N/A | |
4 | Market and Trade | Debate |
blurple's UV Economic Revival Bill was pushed to next meeting due to her not being present. "dead economy" - Niklas |
N/A | |
5 | Member State Promotion and Updates | Debate |
"FC is dead but roads are happening" - Beeper Scintilla still hasn't completed their office in the HQ. "lol yeah HQ really is a vertical city at this point" - Beeper |
N/A | |
6 | Events | Debate |
UV Mario Party needs a prize pool, Niklas is suggesting creating a donation pool similar to how the Olympics does it. Beeper suggests a UV Geoguesser, although the specifics of how that would work was never discussed. |
N/A | |
7 | Any Other Business | Debate |
powercas mentions "the independent voter seats should be in the front" The current Judge (xo) requests an office in the Pearl; Mattie says that on the same floor as the court itself is a good idea, especially because that floor is mostly empty. |
N/A |
Meeting LXXVIX, 24 November 2024, Cloud City
ITEM | ICON | TITLE | TYPE | DESCRIPTION | OUTCOME |
1 | Item 1: Open Nominating for Non-Chair Positions | Statement |
Due to the realignment of terms, this term was shorter than most. The cabinet positions opening this term are: - Judge - Projects and Funds Coordinator - Head of Security - Archivist Both Beeper and xo both said they were re-running during this statement, for PFC and Judge respectively. Election will occur next week(sic, assuming it will be during next meeting) |
N/A | |
2 | Pearl Basement Status Update | Debate |
Beeper updated the attendees about how the basement is coming along:
|
N/A | |
3 | Pearl basement Restaurant Name Vote | Majority Vote |
The choices are: - Restaurant at the end of The Pearl - 0.001 Leagues under the sea - Wineline and Tiki Weirdly enough, all 3 options come from some kind of literature. |
1 vote for 0.001 League Under the Sea | |
4 | Archivist Floor Renovations | Debate/Majority Vote |
Blurple is designing the Archivist floor, as it has been empty for at most 3 years.
The design is based around a grand library type, but was only a little over halfway to completion when the vote came. The vote barely passed, construction of the new Archival floor will start shortly. |
4/0/3; Passed | |
5 | Economic Proposal | Proposal |
A large bill containing many proposed fixes to the economy was posted just before last meeting, as was pushed to today due to absences. There were many issues with the first draft of this bill, most of it coming from the "Reorganize Borealis/Aurora/Freedom City" segment. The part that gave everyone issues was overriding Borealis Council's power and taking over abandoned shops, especially considering the compensation CBUV was returning (90%) could cause disputes, even if everything is meticulously tracked and accounted for. Borealis Council should be tearing down abandoned shops (with backups saved on the Creative server), but this has not happened as of recent, causing the district to be full of empty and unstocked shops, prompting this bills creation. xo did mention allowing the people at CBUV to do this on their own and deal with the repercussions, if any. The Stock Market part of the bill had a wrench thrown into it due to Illyria (and thus the Illyrian Brew Corporation) going dormant. The general consensus is to revisit this bill at a later date, preferably with a more active playerbase. The rest of the bill had no major objections. This bill (coined "The UV Economic Revival Bill") is available digitally on the USUV Bill archives, and physically in-game on Floor 2 of The Pearl. "dead economy" - someone |
N/A | |
6 | Any Other Business | Debate |
Due to the time lost during Item 5, the remaining items were compressed and quickly talked about. Canvas Lite, Wind's automatic mapart project, is complete. Secret Santa for this year has no organiser, xo suggests hosting it. Pumpkin is opening a new town, Sancta. |
N/A |
Meeting LXXX, 14 December 2024, Freedom City
ITEM | ICON | TITLE | TYPE | DESCRIPTION | OUTCOME |
1 | Cabinet Midterm Elections | Majority Vote - USUV Members only | Due to so few candidates for cabinet, the single candidate positions are votes for confirmation, and were done first.
A ballot vote for HoS was held for Lordpipe and Cow |
All 3 votes of confirmation passed; Pipe has won the HoS position | |
2 | Highways and Community Projects | Debate |
The roadway between EverFae, Fort Dunbar, and Eventide is complete, with it expanding north soon. Rendez-vous Point and a 2km long portion of The Voyaway is being worked on; around 2% of the way to Outpost |
N/A | |
3 | Market and Trade | Debate | NoBo is becoming the main shopping district, with Borealis becoming a historical district, and is planned to be less cluttered.
The NoBo apartments plan has been abolished. |
N/A | |
4 | Member State Promotion and Updates | Debate | Solitude is still cool.
Dei Costas is mostly done with construction. It seems the community sentiment is to wait for the new Pale Garden biome, and the blocks that come with it, before continuing building. |
N/A | |
5 | Events | Debate | Geoguesser was great, many people present liked it.
A sequel is wanted, especially for some of the locations that weren't hit in the first game. Secret Santa entry closed, get your presents ready! |
N/A |