Seacrestica Transports
Seacrestica Transports is a player minecart transport company owned by Niklas (aka. Niklas20114552) and Seacrestica.
Route planner
Seacrestica Transports has a route planner for all lines online.
Seacrestica Transports Headquaters
Seacrestica Transports has a HQ in Seacrestica at -1891658 -1893696.
Minecart Lines
UltraStar 1 and 2
Currently work in progress
Downloads
Name | URL |
---|---|
Sounds resource pack | File:ST_UST_1&2.zip |
Timeline
16.06.2024 - The tracks between Pagasa City and Seacrestica are finished.
19.06.2024 - A request has been filed for a building permission for the Outpost train station.
22.06.2024 - The building permission request has been approved.
01.07.2024 - Building at Outpost has started.
12.07.2024 - The tunnel between Seacrestica and Outpost is finished.
13.07.2024 - Building the tracks between Seacrestica and Outpost has started.
18.07.2024 - The Outpost Train Station and the tracks to Seacrestica are finished.
Future Plans
A TO-DO list:
- Build/Finish Evergreen Station
- Connect Evergreen Station to the existing tracks (UST 1/2)
- Build/Finish Banal-Witchita Station
- Connect Banal-Witchita Station with Evergreen (USTe 1/2)
- Build/Finish Ekilorea Station
- Connect Ekilorea Station to the existing tracks (USTe 1/2)
- Build/Finish Malus Station
- Connect Malus Station with Outpost (UST 3/4)
- Build/Finish Eden Station
- Connect Eden Station with Outpost (UST 3/4)
- Build/Finish Illyria Station
- Connect Illyria Station to the existing tracks (UST 1/2)